Has anyone had any luck with Date/Time in the Chart Generator?

5 replies

stalknecht
Contributor
Forum|alt.badge.img+19
  • Contributor
  • July 25, 2019

Can you be more specific?


tbs_gis_team
Contributor
Forum|alt.badge.img+2
  • Author
  • Contributor
  • July 25, 2019

It can only take numeric input...


nampreetatsafe
Safer
Forum|alt.badge.img+12

Hi @tbs_gis_team, this is an existing ticket opened for our development team (internal ref. FMEENGINE-40253). I've linked you're post here with that issue. We'll let you know of any updates to the ticket here.

@rylanatsafe suggests here "If you convert the date/time attribute to FME Date/Time (i.e. using the DateFormatter), then this should result in numeric values and allow you to create the line chart. "


nampreetatsafe
Safer
Forum|alt.badge.img+12
stalknecht wrote:

Can you be more specific?

Hi @tbs_gis_team, this is an existing ticket opened for our development team (internal ref. FMEENGINE-40253). I've linked you're post here with that issue. We'll let you know of any updates to the ticket here.

@rylanatsafe suggests here "If you convert the date/time attribute to FME Date/Time (i.e. using the DateFormatter), then this should result in numeric values and allow you to create the line chart. "


  1. Right click at the X axis in the chart, and select Format Axis from the context menu. ...
  2. Then in the Format Axis pane or Format Axis dialog, under Axis Options tab, open graph image generator check Text axis option in the Axis Type section.

 