I have a problem when creating a workflow in which additional attributes are linked via an identical ID from Excel (name) and Ifc (ETL_TYPEN.NAME). The problem is that not all attributes from the Excel list are recognized and linked and the geometry is taken over in the updated IFC (Writer).
Question


The Problem is also that only 35 Attributes get linked and not all 76, which are in the Ecxellist. And the other Problem is that the Writer writes no Ifc. So i can´t see anything in the Datainspector.
